|
          Trestle number 1 was the original trestle on the A&P RR. It carries the track safely above the irrigation valve which provides the floodwater to support the growth of grass and fruit trees. This trestle over rock creek was replaced in 2007 to accomodate the construction of the 3 stall engine house.